The membrane inspected while it is still a membrane and not a floor.
Pinholes dominate the Marsden Park wet area set: eleven separate records across these jobs, in shower recesses, niches and at the main drain. A pinhole is a break in the applied membrane about the width of a pen tip, usually a burst bubble in the coat or debris trapped beneath it. Alongside them, bond breaker tape at junctions, upturn heights and the membrane left unprotected before the following trades arrive.

Annotated findings from Waterproofing inspections on Marsden Park builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing, or talk to the booking team on 1300 471 805.
A break in the applied membrane roughly the width of a pen tip. It is a hole in a layer whose entire job is to have none.
Close visual inspection across the whole membrane with light, rather than a walk through the room. It is slow, which is why the stage is worth booking on its own.
At a junction where two surfaces move against each other, it lets the membrane span the joint instead of being bonded to both sides and tearing.
AS 3740 for domestic wet area waterproofing, read with the National Construction Code and the ABCB Housing Provisions.
No. A flood test cuts into completed work and forms part of the waterproofer's process, not ours.
We examine what remains open and record the areas already covered.