Building and timber pest in one attendance, each written up separately.
The building component follows AS 4349.1 and the timber pest component AS 4349.3. What the timber pest component produces is a record of evidence and conducive conditions on the day of attendance. It treats nothing and guarantees nothing about the absence of pests.
0 checkpoints across 0 areas on a standard Marsden Park building and pest inspection. We need the lot reachable and your builder aware an independent inspector is attending. Where a stage is unfinished, the report says so rather than passing it.
Building findings of the kind a pest inspection also weighs, recorded on Marsden Park jobs.





New Construction Stage Inspections Seven checks through a Marsden Park build, before each stage is covered.
Pre-Handover (PCI) Inspections The closing list while the final instalment is still yours.
Defect Investigation Reports A single failure, traced to what was required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of Marsden Park's young resale stock. Instant online pricing, or talk to the booking team on 1300 471 805.
Less urgently than an older one, but the risk arrives with the landscaping rather than with the build. Offcuts get buried and beds go in above the brick base, and that is how a path forms.
No. Treatment, and the warranty that comes with it, is the licensed controller's to give. Separating those roles is what preserves the report's independence.
Because masonry sitting proud of its bearing is both a building item and a place where the inspection zone stops being readable. It appears on both sides of the report for that reason.